Case Study / New Build

New Build

October 16, 2025

Project timeline

6 Weeks

Scope of works

Custom 3D Design - In-House Fabrication - Quality Control

Project Overview

Taking on a project to supply various sizes of fridge units to the pharmaceutical and food industries, after the previous supplier had gone out of business.

Deliverables (Technical/ Engineering)

Adapating and improving an existing design, building a fully commissioned fridge unit to work with the leading Hire Company to help to grow their hire and purchase fleet.

Results (The Solution)

A number of sizes and configurations built to create a standalone portfolio of refrigerated units, working with Carrier Refrigeration to

Other impactful projects

Electrical Conversion

Power Control System 

Power Control System